This Manassas-based project involved the demolition of an existing brick factory to prepare for the construction of a two-building data center campus. The team coordinated with the demolition contractor to streamline activities and used onsite materials, including blasted and crushed rock, and installed over 5,000 linear feet of wet utility pipe.

SERVICES PROVIDED

Clearing

Excavation and grading

Drilling and blasting

Survey/stake-out

Wet utility installation

Retaining wall installation

Site concrete

Asphalt paving